monbulk pool - project update
I recently took a site visit around the Monbulk Pool to inspect how the reconstruction was going.
Of recent time the weather has been kind to us and much work is been completed.
Looking toward the new gym, from the access road behind the pool. |
It's terrific to start to see the new parts of the centre take place as the steel work goes up. The concrete is poured to for the new gym and the old pool.
I'll keep you updated along the way. It's wonderful to see this major project for the Lyster Ward start to take shape. I'm very proud to have been able to secure funding for this well overdue project.
Looking toward the new cafe and entry area from the new gym - hard to imagine now! |
Inside the new gum, looking to the rear of the site. The design of the gym takes full advantage of the magnificent view of the riparian area of the Sassafras Creek. |
Looking through the existing pool hall across the existing pool (albeit re-poured) toward the front entry. |
Labels: cr samantha dunn, monbulk aquatic centre, monbulk pool, shire of yarra ranges
0 Comments:
Post a Comment
<< Home